翻訳と辞書
Words near each other
・ Dülken
・ Dülken railway station
・ Dülkener Schöppenmarkt
・ Dülmen
・ Dülmen pony
・ Dülmen station
・ Dülük
・ Düm Tek Tek
・ Dümme Geest Lowland
・ Dümmer
・ Dümmer Nature Park
・ Dümmer See
・ Dümmer, Mecklenburg-Vorpommern
・ Dümmler
・ Dümpelfeld
Dümpelfeld–Lissendorf railway
・ Dün
・ Dün (band)
・ Dünamünde Action
・ Dündar
・ Dündar Aliosman
・ Dündar Kılıç
・ Dündar of Hamidoğlu
・ Dündar Taşer
・ Dündarlı
・ Dündenhorn
・ Düne
・ Dünfus
・ Düngen
・ Düngenheim


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Dümpelfeld–Lissendorf railway : ウィキペディア英語版
Dümpelfeld–Lissendorf railway

|}
The Dümpelfeld–Duppach railway was a non-electrified branch line that lay mostly in what is now the German state of Rhineland-Palatinate. Only a few kilometres of the line near Ahrdorf station ran through North Rhine-Westphalia, which was created in 1946.
== History==

The railway line was planned together with the Jünkerath–Weywertz railway (also called the ''Vennquerbahn'', “Cross-Venn Railway”) in 1900 as a strategic railway to connect the Ahr Valley Railway (''Ahrtalbahn'') with the Eifel Railway. The actual construction started in April 1909. On 30 June 1912, the 44 km route was opened, with the Dümpelfeld–Insul junction section built as a single-track line and the Insul junction–Jünkerath section built as a double-track line. The construction costs totalled 13.2 million marks.
Except during the two world wars, the line never had national importance, therefore it has been operated at times under ''Signalisierter Zugleitbetrieb'' (SZB, a system of train control for low-speed branch lines using simplified signalling technology).
At the end of the Second World War, many bridges were blown up by the Wehrmacht. The reconstruction went on for several years until 1948, when the whole line had been fully restored to traffic. The Lissendorf–Jünkerath section was shut down and dismantled after 1945, with traffic directed over the parallel Eifel line. Henceforth the remaining line was only one track, the second track had been dismantled to provide reparations.
The Dümpelfeld–Lissendorf passenger service was abandoned on 3 June 1973. Freight traffic on the Dümpelfeld-Hillesheim route ended on 30 September 1973 and the line was then dismantled. The remaining Hillesheim–Lissendorf section was finally closed in late 1982 and later dismantled.
The Insul–Schuld and Dorsel–Fuchshofen sections is now used for a rail trail, the ''Ahr-Radweg'' (Ahr Cycle Route).

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Dümpelfeld–Lissendorf railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.